Description
ALBANY, Ga. (WALB) — A new bridge carrying Oglethorpe Boulevard over the Flint River in downtown Albany is scheduled to open Dec. 11, according to the Georgia Department of Transportation (GDOT).
The contractor building the bridge has set the opening date for the crossing, which also carries U.S. 82 Business and State Route 520 Business in Dougherty County.
GDOT told WALB this summer that the bridge was expected to be complete at the end of September. Construction was halted earlier this year after crews had to remove mussels from the project area.
The new bridge replaces a crossing built in 1953 that was designed for vehicles lighter than those commonly driven today. The old bridge’s foundation was also unknown, raising concerns about its potential vulnerability to scour, the erosion of soil and sediment around bridge supports caused by flowing water.
The new crossing has four travel lanes, a sidewalk on the north side and a 12-foot shared-use path on the south side. Its west end, near the civic center, is wider than the east end to accommodate turn lanes for Front Street traffic.
Have a news tip or see an error that needs correction? Let us know. Please include the article’s headline in your message.
To stay up to date on all the latest news as it develops, follow WALB on Facebook, TikTok, Instagram, and X. For more south Georgia news, download the WALB News app and add WALB as a preferred source on Google.
Copyright 2026 WALB. All rights reserved.
News Source : https://www.walb.com/2026/11/10/opening-date-set-long-awaited-new-oglethorpe-bridge-albany/
Other Related News
11/10/2026
THOMASVILLE Ga WALB A new addition to the Thomasville Art Walk is set to be unveiled Thur...
11/10/2026
ALBANY Ga WALB Albany police are working to learn more after a 14-year-old accidentally s...
11/10/2026
WASHINGTON AP Defense Secretary Pete Hegseth dug in for a fight Tuesday against his poten...
11/10/2026
AMERICUS Ga WALB Police are asking for the publics help identifying a man accused of robb...
11/10/2026
